Roy Anderson Corporation – Highland Community Hospital Picayune, MS

Picayune, MS gets a new hospital and O’Brien Flooring is awarded the contract to install flooring on 3 floors plus the MOB Building.  We installed Nora Rubber cold weld floors, VCT, Ecosurface rubber athletic flooring in the pyhsical therapy area, Capri cork flooring, and carpet, for a total of 107,000 sq ft in the new hospital. The expected completion date is June 2012.                                                  

The McDonnel Group LLC – Joy Theatre New Orleans, LA

We were awarded the contract in the joint effort to completly renovate the historical Joy Theatre from damages sustained from the infamous hurricane, Katrina. We intalled the beautiful red carpet from Interface Americas, the majestic stairs were finished with materials from Ecoglo, we installed Forbo heat welded linoleum on the grand stage, also installed was ceramic from Dal Tile in the bathrooms, the bar and the eating areas; for a total of 6500 sq ft of design build.  This georgous building was completed and in use by December 2011.